Full use has been manufactured of all varieties of superior techniques and technologies to attain excelsior manufacturing. Our merchandise assortment involves all kinds of helical equipment, spur gear, bevel equipment, equipment rack, worm gear, sprockets,chains, bearings. Our organization pays particular interest to customers' needs, listening to the specific requirements of each buyer and guaranteeing total satisfaction.
Transient Introduction
ZheJiang EPT EPT Sector EPTT,Ltd is a EPTTized valve manufacturing unit in which intergrate casting , machining, assembling, and top quality handle all jointly in our workshops. Our major merchandise is butterfly valve, gate valve, check out valve, examine valve, globe valve and Y-Strainers and so forth.
Wafer Type Butterfly EPT
Merchandise Description
#8226 One piece via shaft.
300PSI.
-twenty degC-one hundred twenty degC |
Corrosion Security |
Internally and externally fusion bonded epoxy powEPTTcoated( FBE) .
Notes:Layout and material are topic to adjust with out notice.
Set up of EPT Operator With EPTTmper Change:
Butterfly valves are supplied with inner supervisory situation switches. The tamper switch operates by a cam related to the valve stem. The swap will modify placement and shut in two entire turns of the handwheel from the entirely open situation.
EPT Specification
Part Identify | EPT | EN Spec. | ASTM Spec. | |||||
EPT | Entire body | Ductile Iron | EN-JS1050 | A536 sixty five-45-twelve | ||||
Disc | Ductile Iron | EN-JS1050 | A536 65-forty five-twelve | |||||
Shaft | Stainless Steel | BS970 431S29 | AISI431 | |||||
Bushing | Brass | CuZn39Pb3 | B16 C36000 | |||||
EPT Operator | EPT | Forged Iron | EN-JL1040 | A126 Class B | ||||
EPTT | Cast Iron | EN-JL1040 | A126 Course B | |||||
WormEPT | Brass | CuZn39Pb3 | B16 C36000 | |||||
Worm | Stainless Steel | BS970 420S37 | AISI420 | |||||
Handwheel | Solid Iron | EN-JL1040 | A126 Class B |
Size | A | B | D | E | C | F | G | H | L | M |
DN50 | a hundred and ten | seventy four | 90 | forty three | 120 | a hundred and seventy | sixty five | 155 | one hundred fifty | 200 |
DN65 | 118 | eighty five | 90 | forty six | ||||||
DN80 | a hundred thirty | ninety five | 90 | forty six | ||||||
DN100 | a hundred forty five | one hundred fifteen | ninety | 51.5 | ||||||
DN125 | a hundred and sixty | 130 | 90 | 56 | ||||||
DN150 | one hundred seventy five | 145 | ninety | fifty six.5 | ||||||
DN200 | 200 | 170 | one hundred twenty five | 60 | one hundred sixty | 225 | 85 | 206 | 200 | three hundred |
DN250 | 250 | 208 | a hundred twenty five | sixty eight.five | ||||||
DN300 | 275 | 237.5 | a hundred twenty five | seventy nine.five |
EPTT Particulars:
Every laptop into 1 bubble plastic bag, many pcs into one picket situation EPTen EPTT will protect the merchandise from injury during transportation
Supply Particulars:
In thirty daEPTTafter orEPTTconfirmed
Certification:
FAQ
one.Can you offer sample for screening the quality?
Of course.
two. How do we deveXiHu (West EPT) Dis.Hu (West EPT) Dis. new products ?
#8226 Get trial orEPTTand sample or drawing
#8226 Design and style the drawing
#8226 Make the mould and generate sample
#8226 Ship out the sample with first inspection report.
3. What is the delivery time of the orEPTT?
Between thirty-45 daEPTTafter OrEPTTconfirmation. EPT shipping can be arranged if consumer has urgent ask for.
4. What kind of trade expression we just take ?
Generally we use FOB AND CIF.
five. What type of payment term do you just take ?
T/T and L/C.
6. What type of forex can you take?
CNY ,USD and Euro forex.
seven. The place is your nearest loading port?
XiHu (West EPT) Dis.hu (West EPT) Dis.g,TianEPTT.
8.How EPTT will it take to produce products by air?
It normally takes about at most a single week to all key locations.
nine. Can clients pay a visit to the manufacturing facility ?
Sure. We heat-hearted welcome you to go to us.
10. Would you like to choose anyone to be your distinctive agent in a place or a regional market?
Yes.